Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Español |Deutsch |Pусский |
| No.13119497
- Product Categories
- Friendly Links
- home > Supply > Huzhou Green blind blind ditch drainage pipe, tube manufacturers, wholesale Huzhou blind
Information Name: | Huzhou Green blind blind ditch drainage pipe, tube manufacturers, wholesale Huzhou blind |
Published: | 2014-04-22 |
Validity: | 300 |
Specifications: | 4 meters a |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Blind Blind ditch pipe engineering applications: (1), roof drainage (2), playgrounds, golf courses, airports, parks and other green drainage (3), the retaining wall on the back of drainage (vertical, horizontal drainage) (4), agriculture, horticulture underground irrigation and drainage systems (5), hillsides, Dipo other slope drainage (6), tunnels, underpasses and drainage (7), highway, railway embankment and shoulder drainage (8), soft ground treatment blind horizontal drainage Ditch blind pipe main specifications: edit outer diameter Φ80mm, Φ100mm, Φ150mm, Φ200mm, special specifications can be customized. Blind Blind tube features a ditch, composed of fiber plastic blind ditch about 2mm filament, mutual contacts melt to form type, a three-dimensional mesh body, the same principle and the steel truss creation. Surface openings shelter was 95-97%, which is more than five times the bore tube is 3-4 times the resin mesh tube, high surface absorption. 2, the three-dimensional structure, the porosity of 80-95%, the space constituting the same management and lightweight resin compression performance than the tube 10 times stronger structure, and therefore, even if the pressure due to overload, it is a perspective structure, so the residual gap of more than 50% blocked the water problem does not exist, regardless of the earth pressure will be crushed. 3, compressive strength, 250KPa under pressure, the compression ratio is less than 10%. 4, plus there are anti-aging agent, durable under water, soil, etc. into the home for decades but also to ensure stability. 5, compressive strength and flexibility, such as the corners can be curved bit of construction, very light, if the depth of backfill around 10cm, can also be used bulldozers backfilling. 6 Because of these characteristics, so the blind ditch of traditional emerging issues, such as uneven settlement or partial occlusion caused by overloading, crushed function interrupt cause voids caused no problem, you can solve by plastic blind ditch material . 7, the use of hot melt molding method without using an adhesive, the adhesive will not cause the peeling of aging and collapse. |
Admin>>>
You are the 7079 visitor
Copyright © GuangDong ICP No. 10089450, Star Crafts Building Technology Co., Ltd. in Hangzhou All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7079 visitor
Copyright © GuangDong ICP No. 10089450, Star Crafts Building Technology Co., Ltd. in Hangzhou All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility